S/01 FILE / MFG-09
DOSSIER / MFG-09 / REV.C

Built to repeat.

A good prototype proves an idea. A controlled factory proves it ten thousand times. SIGNAL/01 is organized around that second problem.

Manufacturing record / 2009—2026
Industrial manufacturing floor CELL 04 / FINAL CALIBRATION / SHIFT B
OPERATING PRINCIPLES / 01

We engineer the process around the tolerance.

P/01

Control the source

Pressure bodies are linked to material heat certificates before the first tool path begins.

P/02

Measure the behavior

We log switching time, pressure decay and sensor drift under the same working envelope used in customer approval.

P/03

Preserve the record

Every shipment carries a digital batch record that remains searchable for the service life of the unit.

CALIBRATION LINE / 02

Seventeen years measured in capabilities.

2009

First pressure cell

Machining and assembly begin under one 2,400 m² roof.

2015

Full lot trace

Serial-level material and test records become standard across all valves.

2021

IO-Link lab

Electronics validation expands to sensing, communication and EMC testing.

2026

42 markets

Regional stocking programs reduce repeat lead time to fifteen days.

PROOF REGISTER / 03

Evidence, indexed.

Not decorative badges. Each record maps to an audit, machine, procedure or shipped market.

R-01ISO 9001:2015
R-02PED 2014/68/EU
R-03CE / RoHS
R-04ATEX Zone 2
M-1118 CNC cells
M-123 CMM stations
T-21100% pressure log
X-4242 export markets

Audit the system before you approve the part.

Request the quality dossier, sample control plan and a live factory review for your shortlisted configuration.

Request the dossier